Serving Caledon, Ontario · Registered BCIN Designer

Legal Basement & Building Permit Drawings in Caledon & Bolton.

Residence Redefined prepares basement permit drawings for Caledon and Bolton homeowners — legal basement apartments and second units first, plus additions, garden suites and decks — designed to Ontario Building Code requirements and the Town of Caledon's zoning rules.

Request a Consultation
The homeowner's advantage

Get approved permit drawings first. Then let contractors bid.

When you own the drawings, every contractor quotes on the same specifications. You compare prices fairly and choose the builder you trust. As an independent BCIN designer, we prepare the drawings without selling the construction work.

(b) Permitting in Caledon

Town of Caledon Building Services reviews every drawing set.

Caledon covers everything from village lots to estate and rural properties, and the drawing requirements follow that range. A garden suite on a large lot, an addition to a century home, or a secondary unit above a garage each raise different zoning and servicing questions before the Town of Caledon's Building Services team. Some properties also fall within conservation authority areas, where grading, drainage and natural-feature setbacks add review steps. We scope those issues early so the permit submission arrives complete.

  • Drawings checked against Caledon's zoning by-law — including rural and estate-lot rules
  • Conservation authority considerations (grading, drainage, setbacks) identified early
  • Well, septic and servicing implications reviewed before design
  • Permit packages assembled for the Town's submission process
Areas we cover in Caledon
  • Bolton
  • Caledon East
  • Caledon Village
  • Palgrave
  • Inglewood
  • Cheltenham

Not sure if your property is covered? Send us the address and we'll confirm what applies to your lot.

Permit guide · Caledon

Caledon basement permits: how the process works, step by step

A general roadmap for Caledon and Bolton homeowners planning a legal basement apartment or second unit. The Town of Caledon confirms the exact requirements for each property.

  1. 01

    Zoning and unit check

    We check the property against the Town of Caledon zoning by-law for additional residential unit permissions, parking and other rules before design begins.

  2. 02

    Servicing and site screening

    We confirm whether the home is on municipal services or a private well and septic system, and whether conservation authority review may apply — especially for a new side or walk-out entrance.

  3. 03

    Basement measurements

    We measure ceiling heights, beams and ducts, window openings, stairs and existing plumbing so the layout reflects real conditions.

  4. 04

    OBC Part 9 drawing set

    Floor plans, egress, fire separation, smoke and CO alarm locations and ventilation details, prepared by a BCIN designer, with consultant input coordinated where needed.

  5. 05

    Application to the Town

    We assemble the drawings and supporting documents for the Town of Caledon building permit application.

  6. 06

    Review comments and permit

    If Building Services issues comments, we revise and resubmit. Once the permit is issued, contractors can quote like-for-like on the approved drawings.

Gentle Density CIP · Caledon

Caledon ARU grants: funding for eligible projects.

Caledon's Gentle Density Community Improvement Plan (CIP) includes Affordable Rental ARU assistance of up to $30,000 per unit to create or legalize an Additional Residential Unit, such as a basement apartment or detached Garden Unit / Backyard Unit. The Town describes this stream as a forgivable loan; it is conditional assistance, not an automatic payment to every homeowner.

Rural properties developing ARUs or multiplexes may qualify for a Servicing Review Grant of up to $35,000 per property towards a servicing assessment. This is not a promise to fund septic construction or upgrades.

Discuss your basement or Garden Unit drawings →

Check the conditions before budgeting

  • Affordable Rental ARU units must be licensed and maintain affordable rental rates for 2 years; a lease demonstrating that commitment is required for this stream. Family use alone does not establish eligibility.
  • The property must be in good standing and comply with zoning, building and planning requirements. A building permit must have been issued or an application submitted; eligible permits must be issued on or after November 25, 2025.
  • Successful applicants enter a binding agreement with the Town and must begin construction before December 31, 2028. Applications are reviewed first-come, first-served, subject to available funding and Council direction; funding is not guaranteed.
  • Confirm eligibility, required drawings, invoices, application timing and payment conditions with the Town before incurring costs. Permit approval does not itself guarantee CIP approval.

Checked against the Town's current housing page on . Program rules and funding availability may change.

Start your Caledon project

Tell us what you're planning in Caledon.

Tell us about your property and proposed work. We will confirm the drawing and submission scope for your project.

Contractor with a project? Discuss a drawing partnership →
(c) Questions

Caledon permit FAQs

Are there grants for basement apartments or Garden Units in Caledon?+

The Town's Gentle Density CIP lists up to $30,000 per unit for Affordable Rental ARUs, described as a forgivable loan, with licensed units and 2 years of affordable rent. Eligible rural servicing reviews may receive up to $35,000 per property. Both streams have conditions and depend on available funding; ask the Town to confirm eligibility before committing to costs.

Do I need approved permit drawings before applying for Caledon's ARU funding?+

The Town's current guide allows an issued building permit or a submitted building permit application; it does not say the permit must already be approved to apply. Drawings and other supporting documents may be required. Eligible permits must be issued on or after November 25, 2025. A BCIN designer can help prepare a property-specific permit package, but using a BCIN designer is not stated as a universal funding requirement; other lawful design options may apply. Confirm your stream's requirements with the Town.

Can I create a legal basement apartment in Bolton or Caledon?+

Often, yes. Ontario law allows additional residential units on many residential lots, but the property still has to meet the Town of Caledon's zoning by-law and the Ontario Building Code, and a building permit is required. We check zoning, parking and servicing first, then prepare the drawings for the Town's review.

Does a septic system affect a basement apartment in rural Caledon?+

It can. Adding a unit can increase the load on a private septic system, so its capacity may need to be reviewed as part of the permit. We flag this early so it is addressed before drawings are finalised; the Town confirms what is required for your property.

Should I get basement drawings before contractor quotes?+

We recommend it. With approved drawings, every contractor prices the same layout and specifications, so quotes are easier to compare and you keep control of the design.

Do I need a permit for a secondary suite in Caledon?+

Yes. Adding a dwelling unit — in the basement, above a garage or as a detached suite — requires a building permit. The Town of Caledon reviews the drawings for zoning compliance and Ontario Building Code requirements. On rural and estate properties, servicing (well, septic or municipal) also shapes what is possible, so we review that before design.

Does a deck need a permit in Caledon?+

In most cases, yes. Decks higher than about 0.6 m (24 in.) above grade, or attached to the house, generally require a permit under the Ontario Building Code. The Town of Caledon confirms the exact thresholds — and on some properties, grading or conservation authority review can apply, so we check that early.

Can I build a custom home or rebuild in Caledon?+

Yes. New builds and teardown rebuilds are common on Caledon's larger lots. The drawings need to satisfy the Town's zoning by-law — setbacks, height, coverage and in some zones agricultural or estate-lot rules — as well as Ontario Building Code requirements. We start with a zoning feasibility review, then prepare the full permit set.

How long does a Caledon permit take?+

It depends on the project's complexity, how complete the submission is and the town's review queue. Rural and estate projects can involve additional agencies, which adds time. We assemble complete packages and handle revisions if the reviewer issues comments.

Also serving nearby

Permit drawings across our service area.

Start Your Caledon Permit Project

Send us the address and what you have in mind — we'll tell you what's realistic.

Chat on WhatsApp